Project Overview
Enterprise Solutions delivered full electrical construction for HCA Medical City Plano’s bed tower and surgery expansion, a high‑acuity Level 1 trauma center enhancement. The project combined advanced clinical support systems with aggressive schedule and logistics demands, requiring innovation in prefabrication, underground utilities, and mission‑critical power delivery.
Our scope included:
- Complete power distribution and life‑safety systems for the expanded bed tower and surgical suites
- Emergency power infrastructure and redundancy to ensure uninterrupted trauma and surgical operations
- Specialized electrical systems for critical care, ORs, and support spaces
- Advanced underground electrical utility rack systems engineered and fabricated in controlled environments
- Extensive prefabrication program covering 60% of construction elements to accelerate schedule and reduce field labor
- Integration of building systems to support clinical workflows and hospital operations
Project impact:
- Prefabrication delivered measurable efficiencies: ~10% time and cost savings, ~25% reduction in peak workforce needs, and dramatic acceleration of underground utility installation timelines
- Off‑site manufacturing minimized disruption to ongoing hospital operations and improved installation quality and predictability
- Coordinated planning and execution ensured continuity of patient care while delivering resilient, code‑compliant electrical infrastructure
Enterprise Solutions’ integrated approach—combining modular fabrication, precise underground systems, and robust power delivery—helped Medical City Plano expand its capacity to serve critical trauma and surgical needs with reliability and minimal operational impact.







