Project Overview
Enterprise Solutions delivered comprehensive electrical construction for a 3-story Department of Defense (DOD) Administrative Support Complex. The facility provides office space for a substantial portion of the site workforce and includes an auditorium, cafeteria, visitor center, medical suites, and employee health and fitness amenities—program elements that required robust, secure, and energy-efficient electrical systems.
Our scope included:
- Full power distribution, lighting, and life-safety systems for offices, assembly spaces, and support facilities
- Sophisticated lighting control systems with automatic daylight dimming and energy-efficient LED fixtures throughout
- Secure Fiber Trough infrastructure routing multiple miles of classified data cabling
- Government-grade classified security systems, including specialty access-control cameras and interior/exterior security devices
To meet stringent performance and schedule requirements on this fast-track project, we prefabricated over 80% of overhead and in-wall rough-in assemblies in-house and self-performed 85% of the electrical work. This approach enabled rapid progress—roughing in areas exceeding 35,000 sq ft in under 10 days with small crews—while reducing labor costs and field rework.
Enterprise Solutions’ integrated use of design drawings, prefabrication, and disciplined construction techniques delivered secure, efficient, and resilient electrical systems supporting mission-critical operations.





