Private Hangar

Project Overview

Enterprise Solutions created a state-of-the-art aviation facility that seamlessly blends aircraft operations with functional office space. This 26,000 square foot hangar and 4,400 square foot office represents months of careful collaboration, bringing together expertise and vision to deliver a facility designed for both performance and possibility.

Our team of Enterprise professionals delivered comprehensive electrical design, utility coordination, and installation services. Every component was installed by hand, reflecting our commitment to craftsmanship and attention to detail.

Key elements include:

  • 800 Amp primary electrical service with complete distribution systems
  • Power, lighting, and low-voltage infrastructure throughout
  • Hangar door controllers and motorized opening systems
  • Fire alarm and fiber optic connections
  • Fuel island electrical support
  • Future generator pathway preparation

The result is more than infrastructure—it’s a hub designed to serve aircraft operations and the people who depend on them for years to come. Our dedicated field team, this project exemplifies what’s possible when skilled professionals work together toward a shared vision.

This facility now stands ready to support the client’s aviation needs while contributing to Nashville’s growing aerospace community.

Owner:

Confidential

Location:

Nashville, TN

Type of Build:

Aviation Facility

Project Size:

Hangar: 26,000 sq. ft.
Office: 4,400 sq. ft.